fjsds

Editorial Calendar Template

An editorial calendar is more than a list of publish dates — every article needs time for writing, editing, images and approvals. Enter your planned articles with their publish dates and authors, set how many working days each stage takes, and this planner schedules the whole production pipeline backwards, flags clashes where one person has too many deadlines in a week, and exports the plan for your team.

Editorial production planner

Editorial Calendar Template Pack

Excel editorial calendar with production stages and status tracking, a content brief template, an editorial style checklist, a monthly planning worksheet and an article performance review sheet.

Formats: XLSX, DOCX, PDF. Instant download after payment (link valid 72 hours, up to 5 downloads). AI-assisted: the templates were drafted with AI help and reviewed and laid out by Kedop.

$5.00 USD, one-time

Secure card checkout by Stripe. Full refund within 7 days — see the refund policy and license.

What makes an editorial calendar different

A basic content calendar shows what goes out and when. An editorial calendar adds the production workflow behind each piece: who pitches it, who writes it, when the draft is due, who edits it, when images and design are ready, and who gives final approval. Newsrooms, magazines, company blogs and content teams use editorial calendars to keep many articles moving at once without last-minute rushes.

Working backwards from the publish date

  1. Fix the publish date — often set by a campaign, event or regular slot.
  2. Allow a final review stage (fact-check, legal, stakeholder sign-off).
  3. Before that, design and images: graphics, photos, alt text, layout.
  4. Before that, editing: structure, clarity, style, SEO.
  5. Before that, drafting: research, interviews, writing.
  6. Before that, pitch approval: the angle and brief agreed.

The planner subtracts each stage’s working days from the publish date to set every deadline. With the default stages — 2 days pitch, 5 days draft, 3 days edit, 2 days design, 1 day final review — each article needs about 13 working days of lead time.

Stages and who owns them

StageOwnerOutput
Pitch / briefWriter + editorAgreed angle, audience, keywords, sources
DraftWriterComplete draft with links and notes
EditEditorStructural and line edits, SEO checks
DesignDesignerImages, graphics, formatting
Final reviewEditor / approverFact-check, legal, sign-off
Publish and promoteEditor / socialLive article, newsletter and social posts

Balancing workload

Deadlines tend to cluster. If one writer has three drafts due in the same week, or one editor has four final reviews, quality suffers. The planner counts each person’s draft and review deadlines by week and warns when someone has three or more, so you can move publish dates or reassign work before the crunch.

What to track for each article

Worked example

A gardening blog plans five November articles. With the default stage lengths and weekends skipped, the “Beginner’s guide to composting” (publishing Tuesday 10 November) needs the pitch in by Thursday 22 October and approved by Monday 26 October, the draft by Monday 2 November, editing done by Thursday 5 November and design finished by Monday 9 November, leaving a day for final review. Leo edits three of the five pieces, but their edit deadlines fall in different weeks, so the planner shows no workload warnings. The team downloads the CSV into their shared spreadsheet and assigns designers.

Common editorial calendar mistakes

Editorial calendar vs content calendar vs social calendar

CalendarFocusTypical owner
Editorial calendarArticles, reports, newsletters and their production stagesManaging editor
Content calendarEverything published across channels by dateContent or marketing lead
Social calendarIndividual social posts, captions and timesSocial media manager

Larger teams often keep all three, linked: the editorial calendar feeds articles into the content calendar, and the social calendar promotes them.

Setting realistic stage lengths

Base stage lengths on your team’s real turnaround, not ideal conditions. Look at a few recent articles: how long did drafts actually take, how many rounds of edits, how long did approvals sit in someone’s inbox? Longer research pieces, interviews and data-heavy articles need more drafting time; short news items may need only a day. Add a buffer before important campaign dates.

Integrating with your tools

Import the CSV into Google Sheets, Excel, Airtable, Notion, Trello or Asana. Most tools let you turn the dates into calendar views and add reminders. Keep one source of truth: if dates change in the tool, don’t keep editing an old spreadsheet copy.

Privacy

The planner runs in your browser. Article titles and names are not uploaded or stored.

Frequently asked questions

What is an editorial calendar?

A schedule of planned articles with their production stages, owners and deadlines.

How far ahead should I plan?

At least a month, with lead time of two to three weeks per article for most teams.

How long should each stage take?

It varies; many teams allow about a week for drafting and a few days each for editing and design.

Can I skip weekends?

Yes, the planner counts working days when “Skip weekends” is on.

Can I import the schedule into a project tool?

Yes, download the CSV.

Who should own the editorial calendar?

Usually a managing editor or content lead who assigns work and keeps dates current.

How do I handle breaking news or urgent pieces?

Keep a few flexible slots each month and shorten stages for urgent items, noting which scheduled pieces move.

What if a stage takes longer than planned?

Update the stage length or move the publish date, and check the knock-on effect on other articles.

Does the planner handle public holidays?

It skips weekends only; add extra days to stages that cross holidays.

How many articles can one writer handle?

It depends on length and research, but many teams plan one to three substantial articles per writer per week.

Is my data stored?

No, it runs in your browser.